The Whole Wall Matters: Understanding Masonry Assemblies as Integrated Systems

Words: Linda Potter · 4 min read

The Whole Wall Matters: Understanding Masonry Assemblies as Integrated Systems

Words: Linda Potter · 4 min read


Photos:
 Hohmann & Barnard

Where We Are Today
Thermal performance has become one of the dominant conversations in building envelope design. As energy codes evolve, they force the design community to consider the thermal bridges that exist in masonry wall assemblies. The thermal bridges that are discussed most frequently are the masonry anchors and ties, along with shelf angles, which have led to the current innovations around thermally broken brick ties and offset shelf angles as the basis of design. It’s important that the masonry industry accepts these thermal options and incorporates them into the project so we can continue keeping masonry on projects. There are many systems design professionals can choose; we want to keep masonry front and center and be the system of choice because they trust what they get with block and brick, along with thermal efficiency.

Before We Optimize The Wall, We Have To Make It Work
Before the building can be optimized with thermally efficient materials, we must make sure the wall works in several other ways for the thermal efficiency to even matter. The first thing we have to consider is structure. The purpose of a brick tie is to keep the brick connected to the backup structure. It manages the lateral loads on the brick wall, or said another way, the ability to keep the brick stable as the wind loads try to push the brick in or pull it away from the structure. As the cavity size increases due to continuous insulation and/or wide air spaces for aesthetic design, it’s important that we use the appropriate anchors that can manage unique conditions to keep the brick in place and are detailed in a way to limit spalling or cracking due to movement and/or corrosion.

Shelf angles need even more consideration when it comes to structure because they carry the gravity load of the brick above. Due to the catastrophic failure potential, it is even more critical that structure is considered before thermal efficiency. For instance, a 3/8-inch angle is commonly used in a traditional shelf angle application. We’ve started to see a 1/4-inch angle used for shelf angle conditions in offset shelf angle applications. 1/4-inch angles are more thermally efficient and likely more cost-efficient. It’s important that the bracket and angle are engineered to the project conditions with calculations that verify 1/4-inch angles are sufficient for the project. The spacing of the brackets is also something that varies per project. Spacing at 4 feet may be desired for thermal performance, but 2 feet may be what’s necessary after the engineering is completed. The thermal efficiency and cost won’t be worth it if the bracket and angle fail.



Next: Water, Keep The Wall Dry
Once the masonry is structurally connected, we can move to the next consideration of water management. Water is the largest problem in construction lawsuits. It doesn’t matter how beautiful the building is or how thermally efficient it performs; if it can’t keep the water out, there’s a major problem for the building owner. Masonry cavity walls are the first rainscreen wall assembly, which means water is expected to get into the cavity and is designed to divert the water back out by way of through-wall flashing. Flashing itself is a system that requires proper placement of weeps, mortar collection devices, end dams, corners, and termination bar.

However, some details are beginning to show tape or sealant as a termination for the flashing instead of a metal, mechanically fastened termination bar. In tight conditions around window openings that don't allow for termination bar, I can understand why one might accept that strategy. The concern I have is when it’s a standard detail for the entire project due to limiting the penetrations through the sheathing and air barrier in the name of thermal efficiency. It’s possible to detail termination bars with tapes as gaskets and sealant over fasteners to ensure the connection is air- and watertight without removing the mechanical connection. It’s common knowledge that tapes and sealants have a limited lifespan, likely less than the life expectancy of the masonry building itself. The flashing should be installed in such a way that lasts the life of the building, which includes all components to keep the water out.

Then: Air, Keep The Air Where It Belongs
Once you’ve established water management, we can move into air control. This is the most important part of the building enclosure if you want to really impact energy efficiency. Air barriers work when they are continuous, which means they need to tie into the flashing system in the masonry. Compatibility between the air barrier and flashing is something discussed frequently. The tooled bead of sealant at the flashing termination connection needs to be compatible with the air barrier behind it. The brick ties and shelf angles also impact the air barrier. Brick ties with built-in air barrier protection with gaskets or seals help ensure that penetration stays air- and water-resistant. Offset shelf angles allow the air barrier to go on completely and continuously before the angle is installed, which further makes for better air barrier projects.



Conclusion: High Performance Starts With The Basics
There are many parts and pieces of individual materials that make up a masonry cavity wall assembly. It’s important to keep the basics part of the system: keep the brick on the wall, keep the water out, and control the air and penetrations through the air barrier. Then we can optimize the thermal performance. The goal isn’t to choose between structure, moisture, air, and thermal performance. It’s to design an assembly in which all parts of the system work together in the most thermally efficient way. A high-performance wall isn’t a collection of high-performance products. It’s a collection of components that work together to create a high-performance system. 